ITAC Assessment: UD1066
ITAC logo
ITAC Assessment: UD1066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aircraft Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 110,000
ft2
Annual Production 3,782
units
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,826 3,827,497
kWh
Electricity Demand $42,294 8,470
kW-mo/yr
Electricity Fees $7,471 -
Natural Gas $37,092 3,838
MMBtu
TOTAL YEARLY COSTS $311,683
RECOMMENDED SAVINGS* $53,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,253

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $5,952 $600 $5,952
101,400
kWh
- - -
02 2.7241: Install outside air damper / economizer on hvac unit $3,630 $1,415 $3,630
61,838
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,718 $952 $3,330
56,721
kWh
$388
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $671 $1,639 $671
11,438
kWh
- - -
05 2.7135: Install occupancy sensors $1,566 $1,770 $1,078
18,360
kWh
- $155 $333
06 2.4313: Provide proper maintenance of motor driven equipment $21,383 $42,766 $21,383
365,270
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,743 $18,195 $16,128
274,756
kWh
$615
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $5 - $5
87
kWh
- - -
TOTAL RECOMMENDED $53,668 $67,337 $52,177
889,870
kWh
$1,003
-
kW-mo/yr
$155 $333
TOTAL IMPLEMENTED $10,253 $3,654 $10,253
174,676
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs