ITAC Assessment: UD1052
ITAC logo
ITAC Assessment: UD1052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Shock Absorbers
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 420
Plant Area 135,300
ft2
Annual Production 7,595,120
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $960,587 17,299,200
kWh
Electricity Demand $995,183 46,613
kW-mo/yr
Electricity Fees $1,944 -
Natural Gas $213,604 38,453
MMBtu
Waste Disposal Costs
Water Usage $62,700 9,788
Tgal
Water Disposal $93,859 9,788
Tgal
TOTAL YEARLY COSTS $2,327,877
RECOMMENDED SAVINGS* $113,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,988

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,427 - $3,079
54,980
kWh
$2,348
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,718 $6,322 $12,296
219,575
kWh
$6,422
-
kW-mo/yr
- -
03 2.7241: Install outside air damper / economizer on hvac unit $14,073 - $14,073
251,310
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,488 $952 $18,057
322,449
kWh
$9,431
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $13,453 $9,000 $(-110.0)
(-1,964)
kWh
$(-119.0)
-
kW-mo/yr
$13,682
-
MMBtu
-
06 3.4116: Meter recycled water (to reduce sewer charges) $34,801 $16,950 - - - $34,801
-
Tgal
TOTAL RECOMMENDED $113,960 $33,224 $47,395
846,350
kWh
$18,082
-
kW-mo/yr
$13,682
-
MMBtu
$34,801
-
Tgal
TOTAL IMPLEMENTED $46,988 $952 $35,209
628,739
kWh
$11,779
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs