ITAC Assessment: UD1047
ITAC logo
ITAC Assessment: UD1047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Circuits and Cable Harnesses
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 31,210
ft2
Annual Production 1,705,322
units
Production Hrs. Annual 5,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,470 797,316
kWh
Electricity Demand $16,668 2,604
kW-mo/yr
Electricity Fees $12,309 -
Natural Gas $7,925 896
MMBtu
Waste Disposal Costs
Water Usage $2,309 304
Tgal
Water Disposal $1,640 304
Tgal
Solid Waste (non-haz) $20,800 12,000
lb
TOTAL YEARLY COSTS $110,121
RECOMMENDED SAVINGS* $35,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $12,359 - - - - $1,959 $10,400
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $936 - $836
5,928
kWh
$100
-
kW-mo/yr
- - -
03 2.7241: Install outside air damper / economizer on hvac unit $5,243 $400 $5,243
37,186
kWh
- - - -
04 2.2511: Insulate bare equipment $199 $44 $152
1,080
kWh
$47
-
kW-mo/yr
- - -
05 3.4116: Meter recycled water (to reduce sewer charges) $671 $256 - - $671
-
Tgal
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,155 $1,552 $1,002
7,109
kWh
$153
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $14,755 $26,460 $12,305
87,268
kWh
$1,881
-
kW-mo/yr
- - $569
TOTAL RECOMMENDED $35,318 $28,712 $19,538
138,571
kWh
$2,181
-
kW-mo/yr
$671
-
Tgal
$1,959 $10,969
TOTAL IMPLEMENTED $32,357 $26,860 $17,548
124,454
kWh
$1,881
-
kW-mo/yr
- $1,959 $10,969
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs