ITAC Assessment: TN0515
ITAC logo
ITAC Assessment: TN0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product heavy construction equipment
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 360,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $506,023 9,031,946
kWh
Natural Gas $364,619 63,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,200 $3,740 - $2,200
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,074 $1,300 $7,074
126,319
kWh
-
03 2.6218: Turn off equipment when not in use $5,662 - $5,662
101,114
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,397 $600 $3,397
60,668
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,167 $1,280 $2,167
38,687
kWh
-
06 2.3191: Use demand controller or load shedder $102,600 $20,800 $102,600
-
kWh
-
TOTAL RECOMMENDED $123,100 $27,720 $120,900
326,788
kWh
$2,200
-
MMBtu
TOTAL IMPLEMENTED $16,133 $1,900 $16,133
288,101
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs