ITAC Assessment: NL0022
ITAC logo
ITAC Assessment: NL0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 97,600
ft2
Annual Production 678,900
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,033 1,775,825
kWh
Electricity Demand $86,636 4,126
kW-mo/yr
Electricity Fees $25,063 -
TOTAL YEARLY COSTS $182,732
RECOMMENDED SAVINGS* $53,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,523 $155,000 $26,859
718,320
kWh
$20,664
-
kW-mo/yr
-
02 4.651: Install back-up equipment $4,746 $2,010 $196
4,900
kWh
- $4,550
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,010 $5,620 $436
10,900
kWh
- $574
TOTAL RECOMMENDED $53,279 $162,630 $27,491
734,120
kWh
$20,664
-
kW-mo/yr
$5,124
TOTAL IMPLEMENTED $1,010 $5,620 $436
10,900
kWh
- $574
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs