ITAC Assessment: UD1044
ITAC logo
ITAC Assessment: UD1044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aeronautical Systems and Instrumentation
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 44,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,394 7,460,264
kWh
Electricity Demand $121,265 16,548
kW-mo/yr
Electricity Fees $309 -
Natural Gas $22,832 2,792
MMBtu
Waste Disposal Costs
Water Usage $7,436 878
Tgal
Water Disposal $10,352 878
Tgal
TOTAL YEARLY COSTS $604,588
RECOMMENDED SAVINGS* $15,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $4,822 - - - - $4,822
-
Tgal
- -
02 2.4239: Eliminate or reduce compressed air usage $704 - $602
10,128
kWh
$102
-
kW-mo/yr
- - - -
03 2.7314: Reduce ventilation air $6,187 $750 $5,292
89,089
kWh
$895
-
kW-mo/yr
- - - -
04 2.7224: Reduce space conditioning during non-working hours $318 - $86
1,454
kWh
- $232
-
MMBtu
- - -
05 2.7135: Install occupancy sensors $1,611 $900 $798
13,440
kWh
$141
-
kW-mo/yr
- - $134 $538
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,125 $2,940 $1,557
26,206
kWh
$528
-
kW-mo/yr
- - $40 -
TOTAL RECOMMENDED $15,767 $4,590 $8,335
140,317
kWh
$1,666
-
kW-mo/yr
$232
-
MMBtu
$4,822
-
Tgal
$174 $538
TOTAL IMPLEMENTED $318 - $86
1,454
kWh
- $232
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs