Assessment Year | 2022 |
---|---|
Principal Product | Aeronautical Systems and Instrumentation |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $100 M to 500M |
# of Employees | 185 |
Plant Area |
44,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 2,800
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $442,394 | 7,460,264 |
kWh
|
$0.059 | |
Electricity Demand | $121,265 | 16,548 |
kW-mo/yr
|
$7.33 | |
Electricity Fees | $309 | - |
|
- | |
Natural Gas | $22,832 | 2,792 |
MMBtu
|
$8.18 | |
Waste Disposal Costs | |||||
Water Usage | $7,436 | 878 |
Tgal
|
$8.47 | |
Water Disposal | $10,352 | 878 |
Tgal
|
$11.79 | |
TOTAL YEARLY COSTS | $604,588 | ||||
RECOMMENDED SAVINGS* | $15,767 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,822 | - | - | - | - |
$4,822
-
Tgal
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $704 | - |
$602
10,128
kWh
|
$102
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7314: Reduce ventilation air | $6,187 | $750 |
$5,292
89,089
kWh
|
$895
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $318 | - |
$86
1,454
kWh
|
- |
$232
-
MMBtu
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $1,611 | $900 |
$798
13,440
kWh
|
$141
-
kW-mo/yr
|
- | - | $134 | $538 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,125 | $2,940 |
$1,557
26,206
kWh
|
$528
-
kW-mo/yr
|
- | - | $40 | - | |
TOTAL RECOMMENDED | $15,767 | $4,590 |
$8,335
140,317
kWh
|
$1,666
-
kW-mo/yr
|
$232
-
MMBtu
|
$4,822
-
Tgal
|
$174 | $538 | ||
TOTAL IMPLEMENTED | $318 | - |
$86
1,454
kWh
|
- |
$232
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |