ITAC Assessment: UD1043
ITAC logo
ITAC Assessment: UD1043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 120,000
ft2
Annual Production 4,740,302
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $635,981 16,294,680
kWh
Electricity Demand $268,351 24,792
kW-mo/yr
Electricity Fees $31,542 -
Waste Disposal Costs
Water Disposal $1,913 276
Tgal
TOTAL YEARLY COSTS $937,787
RECOMMENDED SAVINGS* $32,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7224: Reduce space conditioning during non-working hours $5,844 - $5,844
149,731
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,705 $30,000 $6,492
171,793
kWh
$213
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $540 - $391
10,006
kWh
$149
-
kW-mo/yr
04 3.1161: Eliminate/reduce an operation $213 - $213
5,446
kWh
-
05 2.7234: Use heat pump for space conditioning $18,707 $62,108 $18,707
479,291
kWh
-
TOTAL RECOMMENDED $32,009 $92,108 $31,647
816,267
kWh
$362
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs