ITAC Assessment: UD1042
ITAC logo
ITAC Assessment: UD1042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Pet's food
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range greater than $500
M
# of Employees 163
Plant Area 295,000
ft2
Annual Production 418,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,064,067 30,923,200
kWh
Electricity Demand $1,355,624 56,940
kW-mo/yr
Electricity Fees $306,430 -
Natural Gas $973,761 206,055
MMBtu
Waste Disposal Costs
Water Usage $57,405 15,229
Tgal
TOTAL YEARLY COSTS $3,757,287
RECOMMENDED SAVINGS* $357,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,033 - $6,306
183,268
kWh
$8,727
-
kW-mo/yr
- - - -
02 2.7314: Reduce ventilation air $10,167 - $5,113
148,593
kWh
$5,054
-
kW-mo/yr
- - - -
03 2.7224: Reduce space conditioning during non-working hours $19,440 - $4,725
137,308
kWh
$4,491
-
kW-mo/yr
- $10,224
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $3,724 $3,750 - - - $3,724
-
MMBtu
- -
05 2.3212: Optimize plant power factor $301,346 $63,514 - - $301,346 - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,761 $14,000 $1,522
44,218
kWh
$1,504
-
kW-mo/yr
- - $1,496 $239
07 2.7135: Install occupancy sensors $3,096 $3,000 $1,214
35,280
kWh
$1,200
-
kW-mo/yr
- - $470 $212
TOTAL RECOMMENDED $357,567 $84,264 $18,880
548,667
kWh
$20,976
-
kW-mo/yr
$301,346 $13,948
-
MMBtu
$1,966 $451
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs