ITAC Assessment: UD1040
ITAC logo
ITAC Assessment: UD1040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Die-Cast Aluminum Automotive Parts
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $50
M
to 100
M
# of Employees 907
Plant Area 418,855
ft2
Annual Production 87,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,465,434 46,960,650
kWh
Electricity Demand $499,243 93,840
kW-mo/yr
Electricity Fees $48,291 -
Natural Gas $904,985 233,438
MMBtu
Waste Disposal Costs
Water Usage $149,511 21,602
Tgal
Water Disposal $105,453 21,602
Tgal
TOTAL YEARLY COSTS $4,172,917
RECOMMENDED SAVINGS* $552,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2514: Cover open tanks $3,104 - - - - $3,104
-
MMBtu
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,896 $453 $20,888
397,867
kWh
$3,528
-
kW-mo/yr
- - - - - $(-11,520.0)
03 2.7314: Reduce ventilation air $8,723 - $7,253
138,148
kWh
$1,470
-
kW-mo/yr
- - - - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $78,304 $700 - - - - - $78,304
-
Tgal
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $146,536 $40,000 $(-1,828.0)
(-34,813)
kWh
$(-265.0)
-
kW-mo/yr
- - $81,234
-
Tgal
$67,395
-
Tgal
- -
06 2.3212: Optimize plant power factor $45,386 $62,689 - - $45,386 - - - - -
07 2.7135: Install occupancy sensors $13,562 $11,900 $11,166
212,688
kWh
$1,886
-
kW-mo/yr
- - - - $290 $220
08 2.7142: Utilize higher efficiency lamps and/or ballasts $37,768 $58,100 $36,197
689,472
kWh
$6,113
-
kW-mo/yr
- - - - $750 $(-5,292.0)
09 2.7314: Reduce ventilation air $201,271 $872,653 - - - $201,271
-
MMBtu
- - - -
10 2.7224: Reduce space conditioning during non-working hours $5,313 - $166
3,171
kWh
- - $5,147
-
MMBtu
- - - -
TOTAL RECOMMENDED $552,863 $1,046,495 $73,842
1,406,533
kWh
$12,732
-
kW-mo/yr
$45,386 $209,522
-
MMBtu
$81,234
-
Tgal
$145,699
-
Tgal
$1,040 $(-16,592.0)
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs