ITAC Assessment: UD1027
ITAC logo
ITAC Assessment: UD1027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Bridge Components
NAICS 325520: Adhesive Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 225,000
ft2
Annual Production 160,000
units
Production Hrs. Annual 5,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,568 5,601,864
kWh
Electricity Demand $111,598 16,607
kW-mo/yr
Electricity Fees $6,144 -
Natural Gas $59,714 19,555
MMBtu
Waste Disposal Costs
Water Usage $18,597 2,391
Tgal
Water Disposal $26,900 2,391
Tgal
TOTAL YEARLY COSTS $522,521
RECOMMENDED SAVINGS* $63,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,612 - $1,260
23,559
kWh
$352
-
kW-mo/yr
- - - -
02 3.4116: Meter recycled water (to reduce sewer charges) $11,486 $1,000 - - - - $11,486
-
Tgal
-
03 3.4115: Recover and reuse cooling water $7,993 - - - - $3,268
-
Tgal
$4,725
-
Tgal
-
04 2.4239: Eliminate or reduce compressed air usage $2,522 - $2,522
47,166
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,842 $1,000 $1,226
22,931
kWh
$616
-
kW-mo/yr
- - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,443 - - - $1,443
-
MMBtu
- - -
07 2.2113: Repair or replace steam traps $6,067 $4,875 - - $6,067
-
MMBtu
- - -
08 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $2,481 $4,300 $1,941
36,288
kWh
$540
-
kW-mo/yr
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $17,013 $65,250 $10,812
202,176
kWh
$3,397
-
kW-mo/yr
- - - $2,804
10 2.4113: Install motor voltage controller on lightly loaded motors $10,735 $43,000 $8,392
156,921
kWh
$2,343
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $63,194 $119,425 $26,153
489,041
kWh
$7,248
-
kW-mo/yr
$7,510
-
MMBtu
$3,268
-
Tgal
$16,211
-
Tgal
$2,804
TOTAL IMPLEMENTED $20,467 $66,250 $13,298
248,666
kWh
$4,365
-
kW-mo/yr
- - - $2,804
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs