Assessment Year | 2021 |
---|---|
Principal Product | Coated and Laminated Paper |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
55,150
ft2
|
Annual Production | 100,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $215,696 | 4,419,995 |
kWh
|
$0.049 | |
Electricity Demand | $90,899 | 9,228 |
kW-mo/yr
|
$9.85 | |
Electricity Fees | $21,536 | - |
|
- | |
Natural Gas | $260,860 | 52,462 |
MMBtu
|
$4.97 | |
Waste Disposal Costs | |||||
Water Usage | $32,908 | 5,628 |
Tgal
|
$5.85 | |
Water Disposal | $3,537 | 240 |
Tgal
|
$14.74 | |
TOTAL YEARLY COSTS | $625,436 | ||||
RECOMMENDED SAVINGS* | $616,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $16,051 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $2,747 | - | - | - |
$2,747
-
MMBtu
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,051 | $340 |
$12,717
260,605
kWh
|
$5,134
-
kW-mo/yr
|
- | $(-1,800.0) | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,411 | $4,000 |
$1,005
20,599
kWh
|
$406
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2511: Insulate bare equipment | $83,809 | $25,133 | - | - |
$83,809
-
MMBtu
|
- | - | - | - | |
05 | 2.1241: Reduce excessive boiler blowdown | $6,710 | $5,224 | - | - |
$6,710
-
MMBtu
|
- | - | - | - | |
06 | 2.8112: Combine utility meters | $8,278 | - | - | - | - | - | $8,278 | - | - | |
07 | 2.3212: Optimize plant power factor | $3,612 | $7,325 | - |
$3,612
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,963 | $26,366 |
$17,627
361,203
kWh
|
$7,116
-
kW-mo/yr
|
- | - | - | $3,220 | - | |
09 | 2.7135: Install occupancy sensors | $11,875 | $4,845 |
$6,704
137,375
kWh
|
$2,706
-
kW-mo/yr
|
- | - | - | $2,465 | - | |
10 | 4.445: Install equipment to move product | $454,408 | $375,000 |
$4,408
90,333
kWh
|
- | - | - | - | - | $450,000 | |
TOTAL RECOMMENDED | $616,864 | $448,233 |
$42,461
870,115
kWh
|
$18,974
-
kW-mo/yr
|
$93,266
-
MMBtu
|
$(-1,800.0) | $8,278 | $5,685 | $450,000 | ||
TOTAL IMPLEMENTED | $16,051 | $340 |
$12,717
260,605
kWh
|
$5,134
-
kW-mo/yr
|
- | $(-1,800.0) | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs