ITAC Assessment: UD1025
ITAC logo
ITAC Assessment: UD1025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Coated and Laminated Paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 55,150
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,696 4,419,995
kWh
Electricity Demand $90,899 9,228
kW-mo/yr
Electricity Fees $21,536 -
Natural Gas $260,860 52,462
MMBtu
Waste Disposal Costs
Water Usage $32,908 5,628
Tgal
Water Disposal $3,537 240
Tgal
TOTAL YEARLY COSTS $625,436
RECOMMENDED SAVINGS* $616,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,051

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7224: Reduce space conditioning during non-working hours $2,747 - - - $2,747
-
MMBtu
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,051 $340 $12,717
260,605
kWh
$5,134
-
kW-mo/yr
- $(-1,800.0) - - -
03 2.4221: Install compressor air intakes in coolest locations $1,411 $4,000 $1,005
20,599
kWh
$406
-
kW-mo/yr
- - - - -
04 2.2511: Insulate bare equipment $83,809 $25,133 - - $83,809
-
MMBtu
- - - -
05 2.1241: Reduce excessive boiler blowdown $6,710 $5,224 - - $6,710
-
MMBtu
- - - -
06 2.8112: Combine utility meters $8,278 - - - - - $8,278 - -
07 2.3212: Optimize plant power factor $3,612 $7,325 - $3,612
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $27,963 $26,366 $17,627
361,203
kWh
$7,116
-
kW-mo/yr
- - - $3,220 -
09 2.7135: Install occupancy sensors $11,875 $4,845 $6,704
137,375
kWh
$2,706
-
kW-mo/yr
- - - $2,465 -
10 4.445: Install equipment to move product $454,408 $375,000 $4,408
90,333
kWh
- - - - - $450,000
TOTAL RECOMMENDED $616,864 $448,233 $42,461
870,115
kWh
$18,974
-
kW-mo/yr
$93,266
-
MMBtu
$(-1,800.0) $8,278 $5,685 $450,000
TOTAL IMPLEMENTED $16,051 $340 $12,717
260,605
kWh
$5,134
-
kW-mo/yr
- $(-1,800.0) - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs