Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Rubber Product
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area 55,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,949 5,266,298
kWh
Electricity Demand $25,058 11,112
kW-mo/yr
Electricity Fees $147,294 -
Waste Disposal Costs
Water Usage $17,869 5,167
Tgal
Water Disposal $66,958 4,633
Tgal
TOTAL YEARLY COSTS $524,127
RECOMMENDED SAVINGS* $120,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,208 - $1,121
22,112
kWh
$87
-
kW-mo/yr
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $75,593 $7,810 - - $14,591
-
Tgal
$61,002
-
Tgal
-
03 2.2511: Insulate bare equipment $9,464 $1,012 $8,823
174,025
kWh
$641
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $768 $203 $579
11,424
kWh
$189
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $9,951 $5,000 $9,277
183,012
kWh
$674
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,346 $1,000 $4,850
95,685
kWh
$296
-
kW-mo/yr
- - $(-1,800.0)
07 2.4226: Use / purchase optimum sized compressor $792 $600 $785
15,489
kWh
$7
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $12,239 $14,500 $10,521
207,556
kWh
$765
-
kW-mo/yr
- - $953
09 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,053 $1,800 $1,053
20,768
kWh
- - - -
10 3.4114: Replace city water with recycled water via cooling tower $5,681 $21,000 $5,485
108,199
kWh
$196
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $120,095 $52,925 $42,494
838,270
kWh
$2,855
-
kW-mo/yr
$14,591
-
Tgal
$61,002
-
Tgal
$(-847.0)
TOTAL IMPLEMENTED $26,744 $20,500 $25,769
508,365
kWh
$1,822
-
kW-mo/yr
- - $(-847.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs