| Assessment Year | 2019 |
|---|---|
| Principal Product | Automotive Steering Components and CVT Transmission Parts |
| NAICS | 336211: Motor Vehicle Body Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 312 |
| Plant Area |
286,518
ft2
|
| Annual Production | 8,547,586
pieces
|
| Production Hrs. Annual | 6,288
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $861,223 | 13,030,500 |
kWh
|
$0.066 |
| Electricity Demand | $41,877 | 2,538 |
kW-mo/yr
|
$16.50 |
| Electricity Fees | $459,902 | - |
|
- |
| Natural Gas | $206,239 | 40,559 |
MMBtu
|
$5.08 |
| TOTAL YEARLY COSTS | $1,569,241 | |||
| RECOMMENDED SAVINGS* | $264,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,647 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $44,647 | $16,500 |
$43,013
650,721
kWh
|
$1,634
-
kW-mo/yr
|
- | |
| 02 | 2.2612: Use cooling tower water instead of refrigeration | $125,929 | $30,000 |
$122,440
1,852,345
kWh
|
$3,489
-
kW-mo/yr
|
- | |
| 03 | 2.2628: Utilize a less expensive cooling method | $27,201 | $54,202 |
$26,447
400,113
kWh
|
$754
-
kW-mo/yr
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $50,796 | - |
$50,796
768,464
kWh
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $8,839 | $3,770 | - | - |
$8,839
-
MMBtu
|
|
| 06 | 2.2442: Preheat combustion air with waste heat | $7,275 | $16,696 | - | - |
$7,275
-
MMBtu
|
|
| TOTAL RECOMMENDED | $264,687 | $121,168 |
$242,696
3,671,643
kWh
|
$5,877
-
kW-mo/yr
|
$16,114
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $44,647 | $16,500 |
$43,013
650,721
kWh
|
$1,634
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs