ITAC Assessment: UD1006
ITAC logo
ITAC Assessment: UD1006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive Steering Components and CVT Transmission Parts
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 312
Plant Area 286,518
ft2
Annual Production 8,547,586
pieces
Production Hrs. Annual 6,288
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $861,223 13,030,500
kWh
Electricity Demand $41,877 2,538
kW-mo/yr
Electricity Fees $459,902 -
Natural Gas $206,239 40,559
MMBtu
TOTAL YEARLY COSTS $1,569,241
RECOMMENDED SAVINGS* $264,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $44,647 $16,500 $43,013
650,721
kWh
$1,634
-
kW-mo/yr
-
02 2.2612: Use cooling tower water instead of refrigeration $125,929 $30,000 $122,440
1,852,345
kWh
$3,489
-
kW-mo/yr
-
03 2.2628: Utilize a less expensive cooling method $27,201 $54,202 $26,447
400,113
kWh
$754
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $50,796 - $50,796
768,464
kWh
- -
05 2.2511: Insulate bare equipment $8,839 $3,770 - - $8,839
-
MMBtu
06 2.2442: Preheat combustion air with waste heat $7,275 $16,696 - - $7,275
-
MMBtu
TOTAL RECOMMENDED $264,687 $121,168 $242,696
3,671,643
kWh
$5,877
-
kW-mo/yr
$16,114
-
MMBtu
TOTAL IMPLEMENTED $44,647 $16,500 $43,013
650,721
kWh
$1,634
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs