ITAC Assessment: AM0684
ITAC logo
ITAC Assessment: AM0684
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Threaded pipe coupling
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 131
Plant Area 45,500
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,122 6,369,144
kWh
Electricity Demand $176,528 13,305
kW-mo/yr
Electricity Fees $2,668 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $24,700 - $10,700
242,400
kWh
$14,000
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,370 - $33,400
758,000
kWh
$21,470
-
kW-mo/yr
$(-40,500.0)
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $14,080 $2,200 $6,080
138,220
kWh
$8,000
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,800 $6,740 $5,500
125,800
kWh
$7,300
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,410 $11 $1,820
41,400
kWh
$3,590
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $476 $1,545 $206
4,680
kWh
$270
-
kW-mo/yr
-
TOTAL RECOMMENDED $71,836 $10,496 $57,706
1,310,500
kWh
$54,630
-
kW-mo/yr
$(-40,500.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs