ITAC Assessment: UD1005
ITAC logo
ITAC Assessment: UD1005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Projection Screens
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 41,373
ft2
Annual Production 1,315,896
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,051 2,475,490
kWh
Electricity Demand $34,682 6,115
kW-mo/yr
Electricity Fees $24,406 -
Natural Gas $71,362 12,245
MMBtu
Waste Disposal Costs
Water Usage $1,814 410
Tgal
Water Disposal $3,857 410
Tgal
TOTAL YEARLY COSTS $257,172
RECOMMENDED SAVINGS* $12,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,162 $50 $2,162
44,216
kWh
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $2,649 $700 - - - $2,649
-
Tgal
03 2.7241: Install outside air damper / economizer on hvac unit $4,736 $12,025 $4,086
83,559
kWh
$650
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $2,555 - $73
1,489
kWh
- $2,482
-
MMBtu
-
TOTAL RECOMMENDED $12,102 $12,775 $6,321
129,264
kWh
$650
-
kW-mo/yr
$2,482
-
MMBtu
$2,649
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs