ITAC Assessment: UD0998
ITAC logo
ITAC Assessment: UD0998
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Air Craft Engine Components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 150,000
ft2
Annual Production 78,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,427 6,973,278
kWh
Electricity Demand $85,395 15,873
kW-mo/yr
Electricity Fees $77,949 -
Natural Gas $13,271 1,276
MMBtu
Waste Disposal Costs
Water Usage $13,861 2,448
Tgal
Water Disposal $10,892 2,484
Tgal
TOTAL YEARLY COSTS $559,794
RECOMMENDED SAVINGS* $38,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,128 - $13,231
257,413
kWh
$1,897
-
kW-mo/yr
- $(-5,000.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,093 - $956
18,604
kWh
$137
-
kW-mo/yr
- -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $10,815 $2,500 $9,947
193,520
kWh
$868
-
kW-mo/yr
- -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,888 $40 $1,561
30,360
kWh
$327
-
kW-mo/yr
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $965 $280 $965
18,772
kWh
- - -
06 3.4116: Meter recycled water (to reduce sewer charges) $7,189 $3,500 - - $7,189
-
Tgal
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,380 $1,315 $2,956
57,512
kWh
$424
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,135 $5,000 $1,868
36,344
kWh
$267
-
kW-mo/yr
- -
09 2.6212: Turn off equipment during breaks, reduce operating time $1,344 $2,520 $1,344
26,140
kWh
- - -
TOTAL RECOMMENDED $38,937 $15,155 $32,828
638,665
kWh
$3,920
-
kW-mo/yr
$7,189
-
Tgal
$(-5,000.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs