Assessment Year | 2019 |
---|---|
Principal Product | Air Craft Engine Components |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
150,000
ft2
|
Annual Production | 78,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $358,427 | 6,973,278 |
kWh
|
$0.051 | |
Electricity Demand | $85,395 | 15,873 |
kW-mo/yr
|
$5.38 | |
Electricity Fees | $77,949 | - |
|
- | |
Natural Gas | $13,271 | 1,276 |
MMBtu
|
$10.40 | |
Waste Disposal Costs | |||||
Water Usage | $13,861 | 2,448 |
Tgal
|
$5.66 | |
Water Disposal | $10,892 | 2,484 |
Tgal
|
$4.39 | |
TOTAL YEARLY COSTS | $559,794 | ||||
RECOMMENDED SAVINGS* | $38,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,128 | - |
$13,231
257,413
kWh
|
$1,897
-
kW-mo/yr
|
- | $(-5,000.0) | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,093 | - |
$956
18,604
kWh
|
$137
-
kW-mo/yr
|
- | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $10,815 | $2,500 |
$9,947
193,520
kWh
|
$868
-
kW-mo/yr
|
- | - | |
04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,888 | $40 |
$1,561
30,360
kWh
|
$327
-
kW-mo/yr
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $965 | $280 |
$965
18,772
kWh
|
- | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $7,189 | $3,500 | - | - |
$7,189
-
Tgal
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,380 | $1,315 |
$2,956
57,512
kWh
|
$424
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,135 | $5,000 |
$1,868
36,344
kWh
|
$267
-
kW-mo/yr
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,344 | $2,520 |
$1,344
26,140
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $38,937 | $15,155 |
$32,828
638,665
kWh
|
$3,920
-
kW-mo/yr
|
$7,189
-
Tgal
|
$(-5,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs