| Assessment Year | 2018 |
|---|---|
| Principal Product | Automotive Sealing Systems |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 256 |
| Plant Area |
273,000
ft2
|
| Annual Production | 53,000,000
units
|
| Production Hrs. Annual | 7,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $606,999 | 9,379,800 |
kWh
|
$0.065 | |
| Electricity Demand | $342,643 | 22,361 |
kW-mo/yr
|
$15.32 | |
| Electricity Fees | $12,982 | - |
|
- | |
| Natural Gas | $197,938 | 41,621 |
MMBtu
|
$4.76 | |
| Waste Disposal Costs | |||||
| Water Usage | $40,539 | 11,977 |
Tgal
|
$3.38 | |
| Water Disposal | $42,366 | 11,977 |
Tgal
|
$3.54 | |
| TOTAL YEARLY COSTS | $1,243,467 | ||||
| RECOMMENDED SAVINGS* | $410,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $248,034 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3134: Shift from daytime to nighttime operation | $100,170 | - | - |
$100,170
-
kW-mo/yr
|
- | - | - | |
| 02 | 3.4116: Meter recycled water (to reduce sewer charges) | $5,091 | $700 | - | - | - |
$5,091
-
Tgal
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46,649 | $33,788 |
$31,073
494,482
kWh
|
$15,576
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $248,034 | $337,264 |
$74,023
1,117,965
kWh
|
$61,796
-
kW-mo/yr
|
$51,315
-
MMBtu
|
- | $60,900 | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,349 | $10,250 |
$6,349
101,034
kWh
|
- | - | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,968 | $8,550 |
$3,968
63,595
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $410,261 | $390,552 |
$115,413
1,777,076
kWh
|
$177,542
-
kW-mo/yr
|
$51,315
-
MMBtu
|
$5,091
-
Tgal
|
$60,900 | ||
| TOTAL IMPLEMENTED | $248,034 | $337,264 |
$74,023
1,117,965
kWh
|
$61,796
-
kW-mo/yr
|
$51,315
-
MMBtu
|
- | $60,900 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs