Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Automotive Sealing Systems
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 256
Plant Area 273,000
ft2
Annual Production 53,000,000
units
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $606,999 9,379,800
kWh
Electricity Demand $342,643 22,361
kW-mo/yr
Electricity Fees $12,982 -
Natural Gas $197,938 41,621
MMBtu
Waste Disposal Costs
Water Usage $40,539 11,977
Tgal
Water Disposal $42,366 11,977
Tgal
TOTAL YEARLY COSTS $1,243,467
RECOMMENDED SAVINGS* $410,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $248,034

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.3134: Shift from daytime to nighttime operation $100,170 - - $100,170
-
kW-mo/yr
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $5,091 $700 - - - $5,091
-
Tgal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $46,649 $33,788 $31,073
494,482
kWh
$15,576
-
kW-mo/yr
- - -
04 2.2449: Recover heat from exhausted steam, hot air or hot water $248,034 $337,264 $74,023
1,117,965
kWh
$61,796
-
kW-mo/yr
$51,315
-
MMBtu
- $60,900
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,349 $10,250 $6,349
101,034
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,968 $8,550 $3,968
63,595
kWh
- - - -
TOTAL RECOMMENDED $410,261 $390,552 $115,413
1,777,076
kWh
$177,542
-
kW-mo/yr
$51,315
-
MMBtu
$5,091
-
Tgal
$60,900
TOTAL IMPLEMENTED $248,034 $337,264 $74,023
1,117,965
kWh
$61,796
-
kW-mo/yr
$51,315
-
MMBtu
- $60,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs