Assessment Year | 2018 |
---|---|
Principal Product | Grey Iron and Ductile Iron Castings |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
108,000
ft2
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,800,451 | 21,224,360 |
kWh
|
$0.085 | |
Electricity Demand | $72,851 | 6,248 |
kW-mo/yr
|
$11.66 | |
Electricity Fees | $1,380 | - |
|
- | |
Natural Gas | $111,339 | 28,116 |
MMBtu
|
$3.96 | |
Waste Disposal Costs | |||||
Water Usage | $17,434 | 3,853 |
Tgal
|
$4.52 | |
Water Disposal | $28,468 | 3,853 |
Tgal
|
$7.39 | |
TOTAL YEARLY COSTS | $2,031,923 | ||||
RECOMMENDED SAVINGS* | $107,729 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,245 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 3.4116: Meter recycled water (to reduce sewer charges) | $14,245 | $700 | - | - |
$14,245
-
Tgal
|
|
02 | 2.4113: Install motor voltage controller on lightly loaded motors | $48,158 | $1,000 |
$30,195
513,529
kWh
|
$17,963
-
kW-mo/yr
|
- | |
03 | 2.4113: Install motor voltage controller on lightly loaded motors | $30,337 | $32,600 |
$21,722
369,418
kWh
|
$8,615
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $11,815 | - |
$9,291
158,017
kWh
|
$2,524
-
kW-mo/yr
|
- | |
05 | 2.4323: Use optimum size and capacity equipment | $3,174 | $9,900 |
$2,489
42,924
kWh
|
$685
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $107,729 | $44,200 |
$63,697
1,083,888
kWh
|
$29,787
-
kW-mo/yr
|
$14,245
-
Tgal
|
||
TOTAL IMPLEMENTED | $14,245 | $700 | - | - |
$14,245
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs