| Assessment Year | 2018 |
|---|---|
| Principal Product | Grey Iron and Ductile Iron Castings |
| NAICS | 331511: Iron Foundries |
| SIC | 3321: Gray and Ductile Iron Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
108,000
ft2
|
| Annual Production | 10,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,800,451 | 21,224,360 |
kWh
|
$0.085 | |
| Electricity Demand | $72,851 | 6,248 |
kW-mo/yr
|
$11.66 | |
| Electricity Fees | $1,380 | - |
|
- | |
| Natural Gas | $111,339 | 28,116 |
MMBtu
|
$3.96 | |
| Waste Disposal Costs | |||||
| Water Usage | $17,434 | 3,853 |
Tgal
|
$4.52 | |
| Water Disposal | $28,468 | 3,853 |
Tgal
|
$7.39 | |
| TOTAL YEARLY COSTS | $2,031,923 | ||||
| RECOMMENDED SAVINGS* | $107,729 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $14,245 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.4116: Meter recycled water (to reduce sewer charges) | $14,245 | $700 | - | - |
$14,245
-
Tgal
|
|
| 02 | 2.4113: Install motor voltage controller on lightly loaded motors | $48,158 | $1,000 |
$30,195
513,529
kWh
|
$17,963
-
kW-mo/yr
|
- | |
| 03 | 2.4113: Install motor voltage controller on lightly loaded motors | $30,337 | $32,600 |
$21,722
369,418
kWh
|
$8,615
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $11,815 | - |
$9,291
158,017
kWh
|
$2,524
-
kW-mo/yr
|
- | |
| 05 | 2.4323: Use optimum size and capacity equipment | $3,174 | $9,900 |
$2,489
42,924
kWh
|
$685
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $107,729 | $44,200 |
$63,697
1,083,888
kWh
|
$29,787
-
kW-mo/yr
|
$14,245
-
Tgal
|
||
| TOTAL IMPLEMENTED | $14,245 | $700 | - | - |
$14,245
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs