ITAC Assessment: UD0989
ITAC logo
ITAC Assessment: UD0989
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Industrial Mezzanines, Safety Steel Guard
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 96,000
ft2
Annual Production 700
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,766 1,004,703
kWh
Electricity Demand $1,808 336
kW-mo/yr
Electricity Fees $46 -
Natural Gas $60,025 11,217
MMBtu
Waste Disposal Costs
Water Usage $980 218
Tgal
Water Disposal $3,065 218
Tgal
TOTAL YEARLY COSTS $122,690
RECOMMENDED SAVINGS* $12,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,033 - $1,033
18,277
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,291 $1,000 $3,486
61,695
kWh
$885
-
kW-mo/yr
- $(-1,080.0) -
03 2.4239: Eliminate or reduce compressed air usage $1,012 - $807
14,291
kWh
$205
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $5,885 $6,000 - - $5,885
-
MMBtu
- -
05 2.7135: Install occupancy sensors $1,362 $1,935 $687
12,161
kWh
$174
-
kW-mo/yr
- - $501
TOTAL RECOMMENDED $12,583 $8,935 $6,013
106,424
kWh
$1,264
-
kW-mo/yr
$5,885
-
MMBtu
$(-1,080.0) $501
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs