| Assessment Year | 2018 |
|---|---|
| Principal Product | Industrial Mezzanines, Safety Steel Guard |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3364: Nonferrous Die-Castings, Except Aluminum |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
96,000
ft2
|
| Annual Production | 700
units
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $56,766 | 1,004,703 |
kWh
|
$0.057 | |
| Electricity Demand | $1,808 | 336 |
kW-mo/yr
|
$5.38 | |
| Electricity Fees | $46 | - |
|
- | |
| Natural Gas | $60,025 | 11,217 |
MMBtu
|
$5.35 | |
| Waste Disposal Costs | |||||
| Water Usage | $980 | 218 |
Tgal
|
$4.50 | |
| Water Disposal | $3,065 | 218 |
Tgal
|
$14.06 | |
| TOTAL YEARLY COSTS | $122,690 | ||||
| RECOMMENDED SAVINGS* | $12,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,033 | - |
$1,033
18,277
kWh
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,291 | $1,000 |
$3,486
61,695
kWh
|
$885
-
kW-mo/yr
|
- | $(-1,080.0) | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $1,012 | - |
$807
14,291
kWh
|
$205
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $5,885 | $6,000 | - | - |
$5,885
-
MMBtu
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $1,362 | $1,935 |
$687
12,161
kWh
|
$174
-
kW-mo/yr
|
- | - | $501 | |
| TOTAL RECOMMENDED | $12,583 | $8,935 |
$6,013
106,424
kWh
|
$1,264
-
kW-mo/yr
|
$5,885
-
MMBtu
|
$(-1,080.0) | $501 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs