ITAC Assessment: UD0988
ITAC logo
ITAC Assessment: UD0988
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Extruded Rubber Profile
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 21
Plant Area 42,000
ft2
Annual Production 45,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,590 1,578,305
kWh
Electricity Demand $13,355 2,446
kW-mo/yr
Natural Gas $2,132 391
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $22,500 30,000
lb
TOTAL YEARLY COSTS $140,577
RECOMMENDED SAVINGS* $54,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $6,505 - $5,850
90,000
kWh
$655
-
kW-mo/yr
- - -
02 2.2515: Use optimum thickness insulation $2,434 $2,072 $2,084
32,076
kWh
$350
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $7,256 $3,172 $6,212
95,570
kWh
$1,044
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $291 - $95
1,455
kWh
$196
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,805 $2,571 $3,875
59,616
kWh
$723
-
kW-mo/yr
- - $207
06 2.7135: Install occupancy sensors $1,216 $595 $943
14,515
kWh
$157
-
kW-mo/yr
- - $116
07 3.5314: Use in-process recycling whenever possible $22,500 $20,000 - - - $22,500
-
lb
-
08 2.2614: Use cooling tower or economizer to replace chiller cooling $5,857 $11,500 $4,720
72,614
kWh
$1,137
-
kW-mo/yr
- - -
09 3.4114: Replace city water with recycled water via cooling tower $3,857 $6,000 $(-488.0)
(-7,503)
kWh
- $4,345
-
Tgal
- -
TOTAL RECOMMENDED $54,721 $45,910 $23,291
358,343
kWh
$4,262
-
kW-mo/yr
$4,345
-
Tgal
$22,500
-
lb
$323
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs