ITAC Assessment: UD0955
ITAC logo
ITAC Assessment: UD0955
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 95,000
ft2
Annual Production 87,098,073
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,964 2,708,084
kWh
Electricity Demand $79,647 8,652
kW-mo/yr
Electricity Fees $2,212 -
Natural Gas $47,827 8,559
MMBtu
Waste Disposal Costs
Water Usage $7,044 2,584
Tgal
Water Disposal $11,476 2,585
Tgal
TOTAL YEARLY COSTS $312,170
RECOMMENDED SAVINGS* $49,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $191 - $84
1,508
kWh
$107
-
kW-mo/yr
- - - - - -
02 2.2511: Insulate bare equipment $15,783 $5,438 $11,789
210,813
kWh
$3,994
-
kW-mo/yr
- - - - - -
03 3.4114: Replace city water with recycled water via cooling tower $15,101 $15,500 $5,839
104,409
kWh
- - - $3,525
-
Tgal
$5,737
-
Tgal
- -
04 3.4116: Meter recycled water (to reduce sewer charges) $3,343 $1,152 - - - - - $3,343
-
Tgal
- -
05 2.8112: Combine utility meters $2,301 - - - $3,021 - - - - $(-720.0)
06 2.4231: Reduce the pressure of compressed air to the minimum required $260 $17 $131
2,338
kWh
$129
-
kW-mo/yr
- - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $319 $1,000 $265
4,735
kWh
$262
-
kW-mo/yr
- - - - $(-208.0) -
08 2.2136: Install / repair insulation on steam lines $4,363 $21,980 - - - $4,363
-
MMBtu
- - - -
09 2.7231: Use radiant heater for spot heating $3,109 $9,840 - - - $3,109
-
MMBtu
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $4,366 $23,200 $2,183
39,032
kWh
$2,158
-
kW-mo/yr
- - - - - $25
TOTAL RECOMMENDED $49,136 $78,127 $20,291
362,835
kWh
$6,650
-
kW-mo/yr
$3,021 $7,472
-
MMBtu
$3,525
-
Tgal
$9,080
-
Tgal
$(-208.0) $(-695.0)
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs