Assessment Year | 2016 |
---|---|
Principal Product | Metrology Machines |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
45,000
ft2
|
Annual Production | 136,309
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,167 | 1,115,440 |
kWh
|
$0.076 |
Electricity Demand | $17,444 | 2,700 |
kW-mo/yr
|
$6.46 |
Natural Gas | $8,114 | 1,229 |
MMBtu
|
$6.60 |
TOTAL YEARLY COSTS | $110,725 | |||
RECOMMENDED SAVINGS* | $18,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,332 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $4,773 | - |
$4,322
56,789
kWh
|
- | $451 | - | |
02 | 2.7135: Install occupancy sensors | $3,278 | $1,200 |
$2,753
36,173
kWh
|
- | $525 | - | |
03 | 3.2124: Convert to air assisted / airless paint guns | $5,257 | $700 |
$44
575
kWh
|
$113
-
kW-mo/yr
|
- | $5,100 | |
04 | 2.4239: Eliminate or reduce compressed air usage | $780 | $750 |
$780
10,255
kWh
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $746 | $50 |
$667
8,760
kWh
|
$79
-
kW-mo/yr
|
- | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $3,332 | $3,750 |
$3,332
43,776
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $18,166 | $6,450 |
$11,898
156,328
kWh
|
$192
-
kW-mo/yr
|
$976 | $5,100 | ||
TOTAL IMPLEMENTED | $3,332 | $3,750 |
$3,332
43,776
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs