ITAC Assessment: UD0944
ITAC logo
ITAC Assessment: UD0944
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Industrial Spray Painting and Powder Coating Services
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 61
Plant Area 100,000
ft2
Annual Production 3,095
units
Production Hrs. Annual 2,340
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,226 1,616,420
kWh
Electricity Demand $34,091 5,928
kW-mo/yr
Natural Gas $174,136 29,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $1,720 $7,315 $1,720
-
MMBtu
02 2.2511: Insulate bare equipment $749 $2,640 $749
-
MMBtu
03 2.2511: Insulate bare equipment $476 $1,148 $476
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $424 - $424
-
MMBtu
TOTAL RECOMMENDED $3,369 $11,103 $3,369
-
MMBtu
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs