Assessment Year | 2015 |
---|---|
Principal Product | Acrylonitrile-Butadiene-Styrene (ABS) and Stryene-Acrylonitrile (SAN) |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
2,000,000
ft2
|
Annual Production | 454,501,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,599,474 | 92,937,522 |
kWh
|
$0.049 |
Natural Gas | $5,053,854 | 1,021,684 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,087,912 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,152 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,152 | - |
$6,152
122,675
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,176 | $3,100 |
$18,176
362,438
kWh
|
- | |
03 | 2.4113: Install motor voltage controller on lightly loaded motors | $1,230 | $2,475 |
$1,230
24,517
kWh
|
- | |
04 | 2.2162: Reduce excess steam bleeding | $946,498 | $1,450,100 | - |
$946,498
-
MMBtu
|
|
05 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $115,856 | $487,083 |
$115,856
2,310,193
kWh
|
- | |
TOTAL RECOMMENDED | $1,087,912 | $1,942,758 |
$141,414
2,819,823
kWh
|
$946,498
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,152 | - |
$6,152
122,675
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs