ITAC Assessment: UD0935
ITAC logo
ITAC Assessment: UD0935
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Acrylonitrile-Butadiene-Styrene (ABS) and Stryene-Acrylonitrile (SAN)
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 2,000,000
ft2
Annual Production 454,501,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,599,474 92,937,522
kWh
Natural Gas $5,053,854 1,021,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,087,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,152 - $6,152
122,675
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,176 $3,100 $18,176
362,438
kWh
-
03 2.4113: Install motor voltage controller on lightly loaded motors $1,230 $2,475 $1,230
24,517
kWh
-
04 2.2162: Reduce excess steam bleeding $946,498 $1,450,100 - $946,498
-
MMBtu
05 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $115,856 $487,083 $115,856
2,310,193
kWh
-
TOTAL RECOMMENDED $1,087,912 $1,942,758 $141,414
2,819,823
kWh
$946,498
-
MMBtu
TOTAL IMPLEMENTED $6,152 - $6,152
122,675
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs