Assessment Year | 2015 |
---|---|
Principal Product | Pumps |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
190,000
ft2
|
Annual Production | 35,500
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $178,568 | 5,537,350 |
kWh
|
$0.032 |
Electricity Demand | $108,479 | 10,536 |
kW-mo/yr
|
$10.30 |
Natural Gas | $265,325 | 52,190 |
MMBtu
|
$5.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $328,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $31,816 | - | - | - |
$31,816
-
MMBtu
|
- | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $23,063 | $4,947 | - | - |
$23,063
-
MMBtu
|
- | - | - | |
03 | 2.2122: Install / repair insulation on condensate lines | $122 | $140 | - | - |
$122
-
MMBtu
|
- | - | - | |
04 | 3.4114: Replace city water with recycled water via cooling tower | $103,649 | $29,400 |
$(-101.0)
(-3,043)
kWh
|
- | - |
$67,651
-
Tgal
|
- |
$36,099
-
Tgal
|
|
05 | 3.4156: Use flow control valves on equipment to optimize water use | $33,724 | $600 | - | - | - |
$21,950
-
Tgal
|
- |
$11,774
-
Tgal
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $61,348 | $65,000 |
$44,701
1,345,603
kWh
|
$16,647
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $11,367 | - |
$11,367
342,160
kWh
|
- | - | - | - | - | |
08 | 2.2437: Recover waste heat from equipment | $7,944 | $1,500 |
$(-56.0)
(-1,679)
kWh
|
$(-24.0)
-
kW-mo/yr
|
$8,024
-
MMBtu
|
- | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,813 | $1,000 |
$7,820
235,405
kWh
|
$2,793
-
kW-mo/yr
|
- | - | $(-4,800.0) | - | |
10 | 2.7221: Lower temperature during the winter season and vice-versa | $39,230 | $67,300 | - | - |
$39,230
-
MMBtu
|
- | - | - | |
11 | 2.7224: Reduce space conditioning during non-working hours | $10,020 | - | - | - |
$10,020
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $328,096 | $169,887 |
$63,731
1,918,446
kWh
|
$19,416
-
kW-mo/yr
|
$112,275
-
MMBtu
|
$89,601
-
Tgal
|
$(-4,800.0) |
$47,873
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs