ITAC Assessment: UD0900
ITAC logo
ITAC Assessment: UD0900
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bakery Equipment
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 150,000
ft2
Annual Production 150
units
Production Hrs. Annual 2,860
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,043 1,018,705
kWh
Electricity Demand $17,139 3,636
kW-mo/yr
Electricity Fees $192 -
Natural Gas $52,741 5,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,461

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $27,790 $9,213 - - $27,790
-
MMBtu
-
02 2.7224: Reduce space conditioning during non-working hours $14,091 $200 - - $14,091
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $540 $1,500 - - $540
-
MMBtu
-
04 2.7135: Install occupancy sensors $698 $170 $579
10,270
kWh
$101
-
kW-mo/yr
- $18
05 2.7135: Install occupancy sensors $583 $210 $479
8,498
kWh
$84
-
kW-mo/yr
- $20
06 2.7135: Install occupancy sensors $119 $20 $119
2,105
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $566 - $419
7,436
kWh
$147
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $565 $2,500 $(-31.0)
(-556)
kWh
$(-11.0)
-
kW-mo/yr
$607
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $332 - $246
4,358
kWh
$86
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,284 $13,813 $1,811
32,111
kWh
$407
-
kW-mo/yr
$43,028
-
MMBtu
$38
TOTAL IMPLEMENTED $29,461 $13,213 $388
6,880
kWh
$136
-
kW-mo/yr
$28,937
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs