ITAC Assessment: UD0897
ITAC logo
ITAC Assessment: UD0897
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Roofing Products
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $100
M
to 500
M
# of Employees 35
Plant Area 63,750
ft2
Annual Production 1,285
Tgal
Production Hrs. Annual 4,320
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,671 2,136,248
kWh
Electricity Demand $27,320 7,044
kW-mo/yr
Electricity Fees $2,568 -
Natural Gas $192,655 32,350
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $10,780 - - - $10,780
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $405 - - - $405
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $755 $1,000 $683
13,563
kWh
$72
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $2,897 $5,000 $2,434
48,341
kWh
$463
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $765 - $676
12,819
kWh
$89
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,409 $5,020 $2,556
50,769
kWh
$628
-
kW-mo/yr
- $225
07 2.7131: Add area lighting switches $664 $600 $396
7,874
kWh
$85
-
kW-mo/yr
- $183
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $142 $900 $142
2,830
kWh
- - -
09 2.7231: Use radiant heater for spot heating $22,517 $48,000 - - $22,517
-
MMBtu
-
TOTAL RECOMMENDED $42,334 $60,520 $6,887
136,196
kWh
$1,337
-
kW-mo/yr
$33,702
-
MMBtu
$408
TOTAL IMPLEMENTED $1,520 $1,000 $1,359
26,382
kWh
$161
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs