ITAC Assessment: UD0882
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastic Mirrors, Skylights
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 95,000
ft2
Annual Production 405,000
pieces
Production Hrs. Annual 1,872
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,373 1,438,800
kWh
Electricity Demand $28,542 5,454
kW-mo/yr
Natural Gas $3,606 481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $162 $200 $162
2,080
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $1,065 $1,600 $796
10,234
kWh
$269
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $638 $500 $701
9,016
kWh
$237
-
kW-mo/yr
- $(-300.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $417 - $312
4,013
kWh
$105
-
kW-mo/yr
- -
05 2.2522: Isolate hot or cold equipment $16,990 $7,200 $12,700
163,320
kWh
$4,290
-
kW-mo/yr
- -
06 2.7224: Reduce space conditioning during non-working hours $1,564 $976 - - $1,564
-
MMBtu
-
TOTAL RECOMMENDED $20,836 $10,476 $14,671
188,663
kWh
$4,901
-
kW-mo/yr
$1,564
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $2,781 $1,676 $1,175
15,109
kWh
$342
-
kW-mo/yr
$1,564
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs