Assessment Year | 2013 |
---|---|
Principal Product | Metal fabricaiton and powder coating |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 32 |
Plant Area |
132,444
ft2
|
Annual Production | 31,881
units
|
Production Hrs. Annual | 1,836
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $199,120 | 2,788,800 |
kWh
|
$0.071 |
Electricity Demand | $36,414 | 8,508 |
kW-mo/yr
|
$4.28 |
Natural Gas | $131,539 | 16,391 |
MMBtu
|
$8.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,389 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $25,570 | - | - | - | - | - | $25,570 | - | |
02 | 2.3212: Optimize plant power factor | $3,308 | $12,000 | - |
$3,308
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.6218: Turn off equipment when not in use | $2,184 | - |
$2,184
30,600
kWh
|
- | - | - | - | - | |
04 | 2.8115: Base utility charges on usage rather than area occupied | $1,416 | $1,400 | - | - | - |
$1,416
-
Tgal
|
- | - | |
05 | 2.7135: Install occupancy sensors | $5,943 | $6,500 |
$5,943
83,232
kWh
|
- | - | - | - | - | |
06 | 2.6218: Turn off equipment when not in use | $1,557 | - |
$1,557
21,808
kWh
|
- | - | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $630 | - |
$466
6,530
kWh
|
$164
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4133: Use most efficient type of electric motors | $6,009 | $14,325 |
$4,421
61,920
kWh
|
$1,588
-
kW-mo/yr
|
- | - | - | - | |
09 | 3.1222: Reduce water use with counter current rinsing | $1,245 | $1,000 | - | - | - | - | - |
$1,245
-
Tgal
|
|
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $706 | $1,000 |
$522
7,306
kWh
|
$184
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.4239: Eliminate or reduce compressed air usage | $489 | $50 |
$361
5,060
kWh
|
$128
-
kW-mo/yr
|
- | - | - | - | |
12 | 2.7231: Use radiant heater for spot heating | $10,039 | $15,000 | - | - |
$8,539
-
MMBtu
|
- | $1,500 | - | |
13 | 2.7229: Air condition only space necessary | $1,344 | - | - | - |
$1,344
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $60,440 | $51,275 |
$15,454
216,456
kWh
|
$5,372
-
kW-mo/yr
|
$9,883
-
MMBtu
|
$1,416
-
Tgal
|
$27,070 |
$1,245
-
Tgal
|
||
TOTAL IMPLEMENTED | $49,389 | $23,900 |
$10,672
149,476
kWh
|
$348
-
kW-mo/yr
|
$9,883
-
MMBtu
|
$1,416
-
Tgal
|
$27,070 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs