ITAC Assessment: UD0873
ITAC logo
ITAC Assessment: UD0873
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Frozen Hamburgers
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 30,400
ft2
Annual Production 61,640,576
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,420 3,953,185
kWh
Electricity Demand $64,606 7,956
kW-mo/yr
Electricity Fees $1,623 -
Natural Gas $46,283 6,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $8,346 - - - - $8,346
-
Tgal
-
02 2.3212: Optimize plant power factor $1,443 $2,400 - $1,443
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,732 $9,904 $4,706
86,032
kWh
$918
-
kW-mo/yr
- - $108
04 2.7142: Utilize higher efficiency lamps and/or ballasts $464 $817 $430
7,865
kWh
- - - $34
05 2.4239: Eliminate or reduce compressed air usage $680 $1,050 $492
9,000
kWh
$188
-
kW-mo/yr
- - -
06 2.7224: Reduce space conditioning during non-working hours $2,165 - - - $2,165
-
MMBtu
- -
07 2.7231: Use radiant heater for spot heating $1,809 - - - $1,809
-
MMBtu
- -
08 2.2437: Recover waste heat from equipment $23,496 $50,000 $1,170
21,396
kWh
$562
-
kW-mo/yr
$21,764
-
MMBtu
- -
09 2.2628: Utilize a less expensive cooling method $6,285 $12,000 $6,285
114,907
kWh
- - - -
TOTAL RECOMMENDED $50,420 $76,171 $13,083
239,200
kWh
$3,111
-
kW-mo/yr
$25,738
-
MMBtu
$8,346
-
Tgal
$142
TOTAL IMPLEMENTED $41,506 $63,354 $6,368
116,428
kWh
$3,111
-
kW-mo/yr
$23,573
-
MMBtu
$8,346
-
Tgal
$108
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings