ITAC Assessment: UD0870
ITAC logo
ITAC Assessment: UD0870
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Flexible Projection Material
NAICS 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 3861: Photographic Equipment and Supplies
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area 43,000
ft2
Annual Production 9,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,850 2,662,507
kWh
Electricity Demand $111,979 6,984
kW-mo/yr
Natural Gas $72,539 10,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7134: Use photocell controls $1,385 $1,660 $422
9,379
kWh
$963
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $5,228 $10,000 $5,228
116,184
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $4,564 $16,800 $4,564
101,430
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $3,610 $1,500 - - $3,610
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,199 $1,500 $810
17,722
kWh
$389
-
kW-mo/yr
-
06 2.2113: Repair or replace steam traps $10,454 $1,800 - - $10,454
-
MMBtu
07 2.2163: Use minimum steam operating pressure $7,517 - - - $7,517
-
MMBtu
08 2.2437: Recover waste heat from equipment $2,567 $4,000 $1,529
33,969
kWh
$1,038
-
kW-mo/yr
-
09 2.2522: Isolate hot or cold equipment $1,602 $4,000 $1,602
35,604
kWh
- -
10 2.2511: Insulate bare equipment $1,512 - $1,512
33,617
kWh
- -
11 2.7224: Reduce space conditioning during non-working hours $2,788 $3,000 - - $2,788
-
MMBtu
TOTAL RECOMMENDED $42,426 $44,260 $15,667
347,905
kWh
$2,390
-
kW-mo/yr
$24,369
-
MMBtu
TOTAL IMPLEMENTED $33,693 $19,460 $7,972
176,902
kWh
$1,352
-
kW-mo/yr
$24,369
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs