Assessment Year | 2011 |
---|---|
Principal Product | Shock Absorbers |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 160 |
Plant Area |
112,000
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 5,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,240 | 3,203,440 |
kWh
|
$0.068 |
Electricity Demand | $108,780 | 943 |
kW-mo/yr
|
$115.36 |
Natural Gas | $95,376 | 9,578 |
MMBtu
|
$9.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,967 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $305 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $21,722 | $145,390 |
$21,722
54,702
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $305 | $25 |
$199
2,922
kWh
|
$106
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,411 | $200 |
$3,894
57,266
kWh
|
$817
-
kW-mo/yr
|
- | $(-300.0) | |
04 | 2.2437: Recover waste heat from equipment | $2,430 | $11,500 | - | - |
$2,430
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,571 | $40,131 |
$6,890
101,331
kWh
|
$3,681
-
kW-mo/yr
|
- | - | |
06 | 2.1224: Replace boiler | $15,607 | $52,190 | - | - |
$15,607
-
MMBtu
|
- | |
07 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $15,451 | $12,000 |
$15,476
227,590
kWh
|
- | - | $(-25.0) | |
08 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $13,470 | $14,800 | - | - |
$13,470
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $83,967 | $276,236 |
$48,181
443,811
kWh
|
$4,604
-
kW-mo/yr
|
$31,507
-
MMBtu
|
$(-325.0) | ||
TOTAL IMPLEMENTED | $305 | $25 |
$199
2,922
kWh
|
$106
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs