ITAC Assessment: UD0813
ITAC logo
ITAC Assessment: UD0813
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Die cut & assembly parts for automotive industry
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 303
Plant Area 203,000
ft2
Annual Production 76,308,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,512 2,944,512
kWh
Electricity Demand $139,520 769
kW-mo/yr
Natural Gas $91,146 5,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $41,029 $28,680 $1,029
39,726
kWh
- - $40,000 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $561 $540 $561
21,600
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $944 - $486
18,751
kWh
$458
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,803 - $1,669
64,447
kWh
$1,574
-
kW-mo/yr
- - $(-1,440.0)
05 2.4224: Upgrade controls on compressors $1,354 $360 $697
26,927
kWh
$657
-
kW-mo/yr
- - -
06 2.4322: Use or replace with energy efficient substitutes $237 $360 $122
4,705
kWh
$115
-
kW-mo/yr
- - -
07 2.2514: Cover open tanks $1,343 $716 $693
26,640
kWh
$650
-
kW-mo/yr
- - -
08 2.2514: Cover open tanks $1,089 $936 $562
21,600
kWh
$527
-
kW-mo/yr
- - -
09 2.2514: Cover open tanks $1,174 $1,468 $594
23,760
kWh
$580
-
kW-mo/yr
- - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $4,098 - $4,098
157,636
kWh
- - - -
11 2.7224: Reduce space conditioning during non-working hours $6,559 - $502
19,396
kWh
- $6,057
-
MMBtu
- -
12 2.7224: Reduce space conditioning during non-working hours $16,732 $15,000 - - $16,732
-
MMBtu
- -
13 2.7224: Reduce space conditioning during non-working hours $3,280 $15,000 - - $3,280
-
MMBtu
- -
TOTAL RECOMMENDED $80,203 $63,060 $11,013
425,188
kWh
$4,561
-
kW-mo/yr
$26,069
-
MMBtu
$40,000 $(-1,440.0)
TOTAL IMPLEMENTED $2,747 - $2,155
83,198
kWh
$2,032
-
kW-mo/yr
- - $(-1,440.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs