Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Aluminum Sand Castings
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 218
Plant Area 165,000
ft2
Annual Production 2,600,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,406,906 18,936,000
kWh
Natural Gas $1,400,000 175,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $352,859 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1113: Reduce combustion air flow to optimum $65,320 - - - $65,320
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,929 $1,000 $39,017
768,768
kWh
$9,912
-
kW-mo/yr
- -
03 2.7241: Install outside air damper / economizer on hvac unit $47,472 $6,525 - - $47,472
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $39,691 - $27,658
512,179
kWh
$10,030
-
kW-mo/yr
- $2,003
05 2.2414: Use waste heat from hot flue gases to preheat $38,304 $20,000 - - $38,304
-
MMBtu
-
06 2.1121: Use insulation in furnaces to facilitate heating / cooling $30,220 - - - $30,220
-
MMBtu
-
07 2.7314: Reduce ventilation air $26,630 $160,000 $5,534
102,482
kWh
- $21,096
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $22,000 - $16,783
310,800
kWh
$5,217
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,675 $45,000 $8,100
150,000
kWh
$10,575
-
kW-mo/yr
- -
10 2.714: Hardware $8,341 $29,290 $4,577
84,762
kWh
$3,348
-
kW-mo/yr
- $416
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,999 $7,312 $5,999
111,088
kWh
- - -
12 2.4239: Eliminate or reduce compressed air usage $1,278 - $975
18,060
kWh
$303
-
kW-mo/yr
- -
TOTAL RECOMMENDED $352,859 $269,127 $108,643
2,058,139
kWh
$39,385
-
kW-mo/yr
$202,412
-
MMBtu
$2,419
TOTAL IMPLEMENTED $79,149 $1,000 $39,017
768,768
kWh
$9,912
-
kW-mo/yr
$30,220
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs