Assessment Year | 2007 |
---|---|
Principal Product | Hamburger Patties |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $100 M to 500M |
# of Employees | 48 |
Plant Area |
101,935
ft2
|
Annual Production | 250,000,000
lb
|
Production Hrs. Annual | 6,084
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,751,958 | 34,392,364 |
kWh
|
$0.051 |
Natural Gas | $135,837 | 10,327 |
MMBtu
|
$13.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,129 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $36,135 | $5,242 | - | - |
$36,135
-
MMBtu
|
- | - | |
02 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $30,994 | $8,900 |
$(-298.0)
(-9,310)
kWh
|
$922
-
kW-mo/yr
|
- |
$30,370
-
lb
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,945 | $57,910 |
$11,699
365,601
kWh
|
$5,900
-
kW-mo/yr
|
- | - | $1,346 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,551 | $8,100 |
$2,596
83,256
kWh
|
$778
-
kW-mo/yr
|
- | - | $177 | |
05 | 2.2694: Use highest temperature for chilling or cold storage | $2,275 | - |
$1,522
45,578
kWh
|
$753
-
kW-mo/yr
|
- | - | - | |
06 | 2.7313: Recycle air for heating, ventilation and air conditioning | $1,835 | $3,670 |
$1,228
38,384
kWh
|
$607
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $93,735 | $83,822 |
$16,747
523,509
kWh
|
$8,960
-
kW-mo/yr
|
$36,135
-
MMBtu
|
$30,370
-
lb
|
$1,523 | ||
TOTAL IMPLEMENTED | $67,129 | $14,142 |
$(-298.0)
(-9,310)
kWh
|
$922
-
kW-mo/yr
|
$36,135
-
MMBtu
|
$30,370
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs