| Assessment Year | 2007 |
|---|---|
| Principal Product | Engineered Chain |
| NAICS | 333613: Mechanical Power Transmission Equipment Manufacturing |
| SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
140,000
ft2
|
| Annual Production | 15,644,000
lb
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $390,861 | 5,032,834 |
kWh
|
$0.078 |
| Natural Gas | $465,847 | 43,244 |
MMBtu
|
$10.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $100,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $54,995 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $32,124 | - | - | - |
$32,124
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,618 | $48,190 |
$10,350
333,887
kWh
|
$13,359
-
kW-mo/yr
|
- | $909 | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,547 | $1,600 |
$4,604
148,500
kWh
|
$5,943
-
kW-mo/yr
|
- | - | |
| 04 | 2.2211: Use optimum temperature | $8,681 | - | - | - |
$8,681
-
MMBtu
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,031 | - | - | - |
$8,031
-
MMBtu
|
- | |
| 06 | 2.2515: Use optimum thickness insulation | $5,633 | $606 | - | - |
$5,633
-
MMBtu
|
- | |
| 07 | 2.7314: Reduce ventilation air | $5,019 | - | - | - |
$5,019
-
MMBtu
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,293 | - |
$1,874
60,456
kWh
|
$2,419
-
kW-mo/yr
|
- | - | |
| 09 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,300 | $992 |
$317
10,230
kWh
|
$983
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $100,246 | $51,388 |
$17,145
553,073
kWh
|
$22,704
-
kW-mo/yr
|
$59,488
-
MMBtu
|
$909 | ||
| TOTAL IMPLEMENTED | $54,995 | $1,600 |
$6,478
208,956
kWh
|
$8,362
-
kW-mo/yr
|
$40,155
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs