ITAC Assessment: UD0748
ITAC logo
ITAC Assessment: UD0748
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aluminum and Steel
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 85,000
ft2
Annual Production 120
ton
Production Hrs. Annual 4,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,715 1,318,120
kWh
Natural Gas $23,093 2,053
MMBtu
Fuel Oil #1 $216,900 1,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $448,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,049

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 4.515: Install shelves / racks to utilize unused space $432,000 $143,750 - - - $432,000
02 2.6218: Turn off equipment when not in use $7,546 - $7,546
125,767
kWh
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $6,200 $840 - - $6,200
-
MMBtu
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,988 $2,960 $1,988
18,975
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $303 $108 $270
4,505
kWh
$33
-
kW-mo/yr
- -
TOTAL RECOMMENDED $448,037 $147,658 $9,804
149,247
kWh
$33
-
kW-mo/yr
$6,200
-
MMBtu
$432,000
TOTAL IMPLEMENTED $14,049 $948 $7,816
130,272
kWh
$33
-
kW-mo/yr
$6,200
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs