Assessment Year | 2004 |
---|---|
Principal Product | Printing, die cutting, paperboard |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 46 |
Plant Area |
77,000
ft2
|
Annual Production | 18
ton
|
Production Hrs. Annual | 5,408
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,822 | 2,072,240 |
kWh
|
$0.035 |
Electricity Demand | $59,486 | 6,804 |
kW-mo/yr
|
$8.74 |
Natural Gas | $19,814 | 2,013 |
MMBtu
|
$9.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,786 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1192: Reduce scrap production | $45,630 | $650 | - | - | - | $45,630 | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,110 | - | - | - | $5,110 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,733 | $5,215 |
$1,103
32,448
kWh
|
$630
-
kW-mo/yr
|
- | - | |
04 | 3.7214: Reduce or eliminate waste | $1,365 | $1,960 | - | - | $1,365 | - | |
05 | 4.125: | $1,200 | - | - | - | - | $1,200 | |
06 | 2.7122: Disconnect ballasts | $762 | $235 |
$422
12,406
kWh
|
$340
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $520 | - |
$331
9,734
kWh
|
$189
-
kW-mo/yr
|
- | - | |
08 | 2.7122: Disconnect ballasts | $392 | $206 |
$150
4,414
kWh
|
$242
-
kW-mo/yr
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $356 | $522 |
$356
10,483
kWh
|
- | - | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $289 | $126 |
$184
5,408
kWh
|
$105
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $57,357 | $8,914 |
$2,546
74,893
kWh
|
$1,506
-
kW-mo/yr
|
$6,475 | $46,830 | ||
TOTAL IMPLEMENTED | $52,786 | $2,942 |
$334
9,822
kWh
|
$347
-
kW-mo/yr
|
$6,475 | $45,630 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs