Assessment Year | 2004 |
---|---|
Principal Product | snow plows and ice control equipment |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
248,700
ft2
|
Annual Production | 9,200
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,957 | 2,997,907 |
kWh
|
$0.075 |
Electricity Demand | $95,387 | 14,412 |
kW-mo/yr
|
$6.62 |
Natural Gas | $156,367 | 27,043 |
MMBtu
|
$5.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,111 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5123: Reduce fluid flow rates | $12,697 | - |
$8,094
114,000
kWh
|
$4,603
-
kW-mo/yr
|
- | - | |
02 | 2.8112: Combine utility meters | $11,340 | - | - |
$9,691
-
kW-mo/yr
|
- | $1,649 | |
03 | 2.7122: Disconnect ballasts | $7,937 | $1,195 |
$5,837
82,210
kWh
|
$2,100
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,898 | $1,635 |
$3,735
52,600
kWh
|
$1,163
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,310 | - |
$1,704
24,000
kWh
|
$606
-
kW-mo/yr
|
- | - | |
06 | 2.4312: Improve lubrication practices | $1,693 | - |
$1,079
15,200
kWh
|
$614
-
kW-mo/yr
|
- | - | |
07 | 2.4112: Install soft-start to eliminate nuisance trips | $739 | $845 |
$545
7,680
kWh
|
$194
-
kW-mo/yr
|
- | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $478 | $2,248 | - | - |
$478
-
MMBtu
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $84 | $270 |
$57
800
kWh
|
$27
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $42,176 | $6,193 |
$21,051
296,490
kWh
|
$18,998
-
kW-mo/yr
|
$478
-
MMBtu
|
$1,649 | ||
TOTAL IMPLEMENTED | $20,111 | $2,750 |
$13,510
190,280
kWh
|
$6,601
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs