ITAC Assessment: UD0698
ITAC logo
ITAC Assessment: UD0698
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product snow plows and ice control equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 248,700
ft2
Annual Production 9,200
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,957 2,997,907
kWh
Electricity Demand $95,387 14,412
kW-mo/yr
Natural Gas $156,367 27,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,111

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.5123: Reduce fluid flow rates $12,697 - $8,094
114,000
kWh
$4,603
-
kW-mo/yr
- -
02 2.8112: Combine utility meters $11,340 - - $9,691
-
kW-mo/yr
- $1,649
03 2.7122: Disconnect ballasts $7,937 $1,195 $5,837
82,210
kWh
$2,100
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,898 $1,635 $3,735
52,600
kWh
$1,163
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,310 - $1,704
24,000
kWh
$606
-
kW-mo/yr
- -
06 2.4312: Improve lubrication practices $1,693 - $1,079
15,200
kWh
$614
-
kW-mo/yr
- -
07 2.4112: Install soft-start to eliminate nuisance trips $739 $845 $545
7,680
kWh
$194
-
kW-mo/yr
- -
08 2.2414: Use waste heat from hot flue gases to preheat $478 $2,248 - - $478
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $84 $270 $57
800
kWh
$27
-
kW-mo/yr
- -
TOTAL RECOMMENDED $42,176 $6,193 $21,051
296,490
kWh
$18,998
-
kW-mo/yr
$478
-
MMBtu
$1,649
TOTAL IMPLEMENTED $20,111 $2,750 $13,510
190,280
kWh
$6,601
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs