ITAC Assessment: UD0667
ITAC logo
ITAC Assessment: UD0667
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Injection molded parts assembly
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 42,000
ft2
Annual Production 4,565,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,746 4,194,000
kWh
Electricity Demand $103,181 7,980
kW-mo/yr
Natural Gas $7,104 995
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,330 $21,177 $2,450
94,190
kWh
$3,880
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,500 $13,580 $2,483
95,472
kWh
$2,017
-
kW-mo/yr
- -
03 2.7226: Use computer programs to optimize hvac performance $3,794 - $3,794
145,933
kWh
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $1,541 - $339
13,504
kWh
- $1,202
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,175 - $650
24,970
kWh
$525
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,040 - $(-15.0)
(-571)
kWh
$1,738
-
kW-mo/yr
- $(-683.0)
07 2.7135: Install occupancy sensors $150 $212 $150
5,695
kWh
- - -
TOTAL RECOMMENDED $18,530 $34,969 $9,851
379,193
kWh
$8,160
-
kW-mo/yr
$1,202
-
MMBtu
$(-683.0)
TOTAL IMPLEMENTED $1,175 - $650
24,970
kWh
$525
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs