Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Dog cat and small animal feed
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 95,000
ft2
Annual Production 50,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,272 5,044,906
kWh
Electricity Demand $106,547 13,572
kW-mo/yr
Natural Gas $319,555 53,767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 4.625: Develop standard operating procedures $147,420 - - - - - $147,420
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,350 $1,122 $9,123
268,320
kWh
$4,227
-
kW-mo/yr
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,888 - - $8,888
-
kW-mo/yr
- - -
04 3.4116: Meter recycled water (to reduce sewer charges) $4,492 $500 - - - $4,492
-
Tgal
-
05 2.4226: Use / purchase optimum sized compressor $2,914 - $2,016
59,280
kWh
$898
-
kW-mo/yr
- - -
06 2.2136: Install / repair insulation on steam lines $1,566 $3,665 - - $1,566
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $2,418 $920
18,720
kWh
$284
-
kW-mo/yr
- - -
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $909 - $389
11,440
kWh
$520
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $180,743 $7,705 $12,448
357,760
kWh
$14,817
-
kW-mo/yr
$1,566
-
MMBtu
$4,492
-
Tgal
$147,420
TOTAL IMPLEMENTED $161,974 $3,540 $10,043
287,040
kWh
$4,511
-
kW-mo/yr
- - $147,420
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs