ITAC Assessment: UD0651
ITAC logo
ITAC Assessment: UD0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Injection Molded Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 164,000
ft2
Annual Production 2,935,854
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,263 7,250,400
kWh
Electricity Demand $181,349 19,368
kW-mo/yr
Natural Gas $25,651 3,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $283,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $259,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Personnel Changes Savings
01 4.625: Develop standard operating procedures $165,000 - - - - - $165,000
02 4.652: Replace existing equipment with more suitable substitutes $37,254 $5,000 - - - $624
-
gal
$36,630
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $23,217 - $(-3,224.0)
(-97,700)
kWh
$26,441
-
kW-mo/yr
- - -
04 2.3212: Optimize plant power factor $19,136 $24,000 - - $19,136 - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,563 $51,600 $15,563
471,600
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,418 $12,200 $5,326
161,400
kWh
$3,092
-
kW-mo/yr
- - -
07 2.3134: Shift from daytime to nighttime operation $7,528 - - $7,528
-
kW-mo/yr
- - -
08 2.6218: Turn off equipment when not in use $5,833 $1,125 $5,833
176,750
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $751 $1,737 $475
14,400
kWh
$276
-
kW-mo/yr
- - -
10 2.7311: Ventilation system to shut off when room is not in use $313 - $198
6,000
kWh
$115
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $283,013 $95,662 $24,171
732,450
kWh
$37,452
-
kW-mo/yr
$19,136 $624
-
gal
$201,630
TOTAL IMPLEMENTED $259,032 $31,862 $3,282
99,450
kWh
$34,360
-
kW-mo/yr
$19,136 $624
-
gal
$201,630
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs