Assessment Year | 2002 |
---|---|
Principal Product | Plastic Blow Molding |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
95,000
ft2
|
Annual Production | 7,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,926 | 5,185,200 |
kWh
|
$0.037 |
Electricity Demand | $87,544 | 12,696 |
kW-mo/yr
|
$6.90 |
Natural Gas | $32,980 | 3,312 |
MMBtu
|
$9.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,996 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.513: Re-arrange equipment layout to reduce labor costs | $18,752 | $4,500 | - | - | - | $12,480 | $112 | $6,160 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,379 | $45,000 |
$12,329
329,659
kWh
|
$5,050
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.6218: Turn off equipment when not in use | $6,156 | $1,323 |
$6,156
164,600
kWh
|
- | - | - | - | - | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,749 | $2,500 | - | - |
$2,749
-
Tgal
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,235 | $7,600 |
$1,633
43,680
kWh
|
$602
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,108 | $196 |
$1,540
41,184
kWh
|
$568
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,899 | $5,800 |
$1,340
35,828
kWh
|
$559
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $989 | $2,502 |
$723
19,344
kWh
|
$266
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $52,267 | $69,421 |
$23,721
634,295
kWh
|
$7,045
-
kW-mo/yr
|
$2,749
-
Tgal
|
$12,480 | $112 | $6,160 | ||
TOTAL IMPLEMENTED | $4,996 | $8,498 |
$3,603
96,356
kWh
|
$1,393
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs