ITAC Assessment: UD0646
ITAC logo
ITAC Assessment: UD0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Metal heat-treating and plating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 53,000
ft2
Annual Production 33,600,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,333 3,898,476
kWh
Electricity Demand $32,208 8,052
kW-mo/yr
Natural Gas $204,948 19,569
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.4156: Use flow control valves on equipment to optimize water use $33,646 $32,000 - - - $33,646
-
Tgal
02 2.2136: Install / repair insulation on steam lines $25,468 $12,700 - - $25,468
-
MMBtu
-
03 2.7245: Use direct air supply to exhaust hoods $9,581 $675 - - $9,581
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $2,685 $2,000 - - $2,685
-
MMBtu
-
05 2.2511: Insulate bare equipment $2,204 $3,320 - - $2,204
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,390 $5,088 $1,169
40,230
kWh
$221
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,342 $61 $1,121
38,640
kWh
$221
-
kW-mo/yr
- -
08 2.8114: Change rate schedules or other changes in utility service $1,092 - - - - $1,092
-
Tgal
09 2.7142: Utilize higher efficiency lamps and/or ballasts $613 $1,431 $512
17,640
kWh
$101
-
kW-mo/yr
- -
10 2.7144: Install spectral reflectors / delamp $379 $499 $317
10,920
kWh
$62
-
kW-mo/yr
- -
11 2.5111: Convert from indirect to direct fired systems $311 $640 $244
8,400
kWh
$67
-
kW-mo/yr
- -
TOTAL RECOMMENDED $78,711 $58,414 $3,363
115,830
kWh
$672
-
kW-mo/yr
$39,938
-
MMBtu
$34,738
-
Tgal
TOTAL IMPLEMENTED $62,178 $47,199 $317
10,920
kWh
$62
-
kW-mo/yr
$28,153
-
MMBtu
$33,646
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs