| Assessment Year | 2002 |
|---|---|
| Principal Product | Metal stampings |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
350,000
ft2
|
| Annual Production | 230,000,000
pieces
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $248,232 | 5,516,272 |
kWh
|
$0.045 |
| Electricity Demand | $23,299 | 15,024 |
kW-mo/yr
|
$1.55 |
| Fuel Oil #1 | $23,704 | 3,138 |
MMBtu
|
$7.55 |
| Other Gas | $77,453 | 4,998 |
MMBtu
|
$15.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $282,856 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $59,200 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Other Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.621: Use fixtures to reduce machine changeout times | $181,200 | $252,000 | - | - | - | - | - | $181,200 | |
| 02 | 2.1331: Burn a less expensive grade of fuel | $57,385 | $82,200 | - | - |
$(-43,772.0)
-
MMBtu
|
$23,704
-
MMBtu
|
$77,453
-
MMBtu
|
- | |
| 03 | 2.6122: Adjust vents to minimize energy use | $37,432 | $39,000 | - | - | - | - |
$37,432
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,719 | $11,324 |
$2,462
54,720
kWh
|
$257
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.3212: Optimize plant power factor | $2,305 | $6,500 | - |
$2,305
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,815 | $7,700 |
$1,644
36,540
kWh
|
$171
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $282,856 | $398,724 |
$4,106
91,260
kWh
|
$2,733
-
kW-mo/yr
|
$(-43,772.0)
-
MMBtu
|
$23,704
-
MMBtu
|
$114,885
-
MMBtu
|
$181,200 | ||
| TOTAL IMPLEMENTED | $59,200 | $89,900 |
$1,644
36,540
kWh
|
$171
-
kW-mo/yr
|
$(-43,772.0)
-
MMBtu
|
$23,704
-
MMBtu
|
$77,453
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Other Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs