ITAC Assessment: AM0589
ITAC logo
ITAC Assessment: AM0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product plastic soft drink bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 68
Plant Area 425,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $839,568 14,849,026
kWh
Electricity Demand $250,248 36,588
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $21,960 $90 $17,250
331,800
kWh
$4,710
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,080 $23 $5,560
107,000
kWh
$1,520
-
kW-mo/yr
-
03 2.8121: Apply for tax-free status for energy purchases $5,251 - - - $5,251
04 2.7132: Install timers on light switches in little used areas $4,230 $370 $3,600
68,700
kWh
$630
-
kW-mo/yr
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,885 - - $2,885
-
kW-mo/yr
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,575 - - $1,575
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $205 $225 $160
3,050
kWh
$45
-
kW-mo/yr
-
08 2.8123: Pay utility bills on time $236 - - - $236
TOTAL RECOMMENDED $43,422 $708 $26,570
510,550
kWh
$11,365
-
kW-mo/yr
$5,487
TOTAL IMPLEMENTED $40,537 $708 $26,570
510,550
kWh
$8,480
-
kW-mo/yr
$5,487
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs