ITAC Assessment: UD0639
ITAC logo
ITAC Assessment: UD0639
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Robotic Systems
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 182,000
ft2
Annual Production 1,418
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,003 3,501,600
kWh
Electricity Demand $138,786 9,864
kW-mo/yr
Natural Gas $12,488 1,431
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,669 $17,123 $3,097
114,724
kWh
$5,572
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $2,052 $253
9,373
kWh
$304
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $450 $1,698 $180
6,656
kWh
$270
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $418 - $148
5,491
kWh
$270
-
kW-mo/yr
TOTAL RECOMMENDED $10,094 $20,873 $3,678
136,244
kWh
$6,416
-
kW-mo/yr
TOTAL IMPLEMENTED $1,425 $3,750 $581
21,520
kWh
$844
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs