| Assessment Year | 2001 |
|---|---|
| Principal Product | Custom blow molded plastic parts |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
85,000
ft2
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $351,785 | 9,230,400 |
kWh
|
$0.038 |
| Electricity Demand | $175,352 | 17,448 |
kW-mo/yr
|
$10.05 |
| Natural Gas | $3,406 | 380 |
MMBtu
|
$8.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,076 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,708 | $55,000 |
$15,870
377,849
kWh
|
$6,838
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,972 | $315 |
$9,716
231,336
kWh
|
$3,256
-
kW-mo/yr
|
- | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,095 | $4,500 |
$7,562
180,050
kWh
|
$2,533
-
kW-mo/yr
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,767 | $13,700 |
$7,778
185,182
kWh
|
$989
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $5,466 | $2,880 |
$4,048
96,390
kWh
|
$1,418
-
kW-mo/yr
|
- | |
| 06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,363 | $100 |
$2,519
59,976
kWh
|
$844
-
kW-mo/yr
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,047 | $3,000 |
$655
15,600
kWh
|
$392
-
kW-mo/yr
|
- | |
| 08 | 3.5112: Reprocess spent oils on site for re-use | $835 | $3,323 | - | - |
$835
-
gal
|
|
| TOTAL RECOMMENDED | $65,253 | $82,818 |
$48,148
1,146,383
kWh
|
$16,270
-
kW-mo/yr
|
$835
-
gal
|
||
| TOTAL IMPLEMENTED | $52,076 | $66,018 |
$37,196
885,625
kWh
|
$14,045
-
kW-mo/yr
|
$835
-
gal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs