ITAC Assessment: UD0625
ITAC logo
ITAC Assessment: UD0625
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Custom blow molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 85,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,785 9,230,400
kWh
Electricity Demand $175,352 17,448
kW-mo/yr
Natural Gas $3,406 380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,076

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,708 $55,000 $15,870
377,849
kWh
$6,838
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,972 $315 $9,716
231,336
kWh
$3,256
-
kW-mo/yr
-
03 2.6212: Turn off equipment during breaks, reduce operating time $10,095 $4,500 $7,562
180,050
kWh
$2,533
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,767 $13,700 $7,778
185,182
kWh
$989
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $5,466 $2,880 $4,048
96,390
kWh
$1,418
-
kW-mo/yr
-
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,363 $100 $2,519
59,976
kWh
$844
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,047 $3,000 $655
15,600
kWh
$392
-
kW-mo/yr
-
08 3.5112: Reprocess spent oils on site for re-use $835 $3,323 - - $835
-
gal
TOTAL RECOMMENDED $65,253 $82,818 $48,148
1,146,383
kWh
$16,270
-
kW-mo/yr
$835
-
gal
TOTAL IMPLEMENTED $52,076 $66,018 $37,196
885,625
kWh
$14,045
-
kW-mo/yr
$835
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs