Assessment Year | 2001 |
---|---|
Principal Product | Aerospace Products |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
78,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,913 | 6,450,600 |
kWh
|
$0.022 |
Electricity Demand | $160,541 | 11,928 |
kW-mo/yr
|
$13.46 |
Natural Gas | $94,584 | 16,254 |
MMBtu
|
$5.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,943 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,863 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5112: Reprocess spent oils on site for re-use | $39,420 | - | - | - | - |
$3,780
-
gal
|
- | $35,640 | |
02 | 2.6218: Turn off equipment when not in use | $11,768 | - |
$1,082
49,200
kWh
|
- |
$10,686
-
MMBtu
|
- | - | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $7,723 | - |
$3,016
137,088
kWh
|
$4,707
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,298 | $3,000 | - | - | - | - |
$7,298
-
lb
|
- | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $5,092 | $2,000 | - | - | - | - | - | $5,092 | |
06 | 2.2511: Insulate bare equipment | $1,280 | $2,460 | - | - |
$1,280
-
MMBtu
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $966 | $2,220 |
$630
14,688
kWh
|
$336
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $396 | - |
$194
8,813
kWh
|
$202
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $73,943 | $9,680 |
$4,922
209,789
kWh
|
$5,245
-
kW-mo/yr
|
$11,966
-
MMBtu
|
$3,780
-
gal
|
$7,298
-
lb
|
$40,732 | ||
TOTAL IMPLEMENTED | $25,863 | $4,460 |
$4,098
186,288
kWh
|
$4,707
-
kW-mo/yr
|
$11,966
-
MMBtu
|
- | - | $5,092 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs