ITAC Assessment: UD0621
ITAC logo
ITAC Assessment: UD0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aerospace Products
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 78,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,913 6,450,600
kWh
Electricity Demand $160,541 11,928
kW-mo/yr
Natural Gas $94,584 16,254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.5112: Reprocess spent oils on site for re-use $39,420 - - - - $3,780
-
gal
- $35,640
02 2.6218: Turn off equipment when not in use $11,768 - $1,082
49,200
kWh
- $10,686
-
MMBtu
- - -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,723 - $3,016
137,088
kWh
$4,707
-
kW-mo/yr
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $7,298 $3,000 - - - - $7,298
-
lb
-
05 3.4116: Meter recycled water (to reduce sewer charges) $5,092 $2,000 - - - - - $5,092
06 2.2511: Insulate bare equipment $1,280 $2,460 - - $1,280
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $966 $2,220 $630
14,688
kWh
$336
-
kW-mo/yr
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $396 - $194
8,813
kWh
$202
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $73,943 $9,680 $4,922
209,789
kWh
$5,245
-
kW-mo/yr
$11,966
-
MMBtu
$3,780
-
gal
$7,298
-
lb
$40,732
TOTAL IMPLEMENTED $25,863 $4,460 $4,098
186,288
kWh
$4,707
-
kW-mo/yr
$11,966
-
MMBtu
- - $5,092
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs