| Assessment Year | 2001 |
|---|---|
| Principal Product | Rubber Products |
| NAICS |
n/a
|
| SIC | 3052: Rubber and Plastics Hose and Belting |
| Sales Range | $100 M to 500M |
| # of Employees | 263 |
| Plant Area |
366,000
ft2
|
| Annual Production | 84,000,000
lb
|
| Production Hrs. Annual | 6,360
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $361,346 | 18,917,438 |
kWh
|
$0.019 |
| Electricity Demand | $653,325 | 46,500 |
kW-mo/yr
|
$14.05 |
| Natural Gas | $378,567 | 64,741 |
MMBtu
|
$5.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $175,648 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $169,008 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $124,956 | - | - |
$128,136
-
kW-mo/yr
|
- | - | - | - | $(-3,180.0) | |
| 02 | 3.5112: Reprocess spent oils on site for re-use | $18,573 | $6,262 | - | - | - | - |
$18,573
-
gal
|
- | - | |
| 03 | 3.4155: Meter waste water | $14,438 | $500 | - | - | - |
$14,438
-
Tgal
|
- | - | - | |
| 04 | 3.5311: Recover and reuse waste material | $5,700 | - | - | - | - | - | - |
$5,700
-
lb
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $6,322 | $940 | - | - |
$6,322
-
MMBtu
|
- | - | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $2,846 | $5,628 |
$2,003
95,400
kWh
|
$843
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 2.7124: Make a practice of turning off lights when not needed | $1,873 | $2,400 |
$828
39,439
kWh
|
$1,045
-
kW-mo/yr
|
- | - | - | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $940 | $2,256 |
$417
19,840
kWh
|
$523
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $175,648 | $17,986 |
$3,248
154,679
kWh
|
$130,547
-
kW-mo/yr
|
$6,322
-
MMBtu
|
$14,438
-
Tgal
|
$18,573
-
gal
|
$5,700
-
lb
|
$(-3,180.0) | ||
| TOTAL IMPLEMENTED | $169,008 | $15,730 |
$2,831
134,839
kWh
|
$130,024
-
kW-mo/yr
|
$6,322
-
MMBtu
|
$14,438
-
Tgal
|
$18,573
-
gal
|
- | $(-3,180.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs