ITAC Assessment: UD0619
ITAC logo
ITAC Assessment: UD0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Rubber Products
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $100
M
to 500
M
# of Employees 263
Plant Area 366,000
ft2
Annual Production 84,000,000
lb
Production Hrs. Annual 6,360
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,346 18,917,438
kWh
Electricity Demand $653,325 46,500
kW-mo/yr
Natural Gas $378,567 64,741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $175,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $169,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $124,956 - - $128,136
-
kW-mo/yr
- - - - $(-3,180.0)
02 3.5112: Reprocess spent oils on site for re-use $18,573 $6,262 - - - - $18,573
-
gal
- -
03 3.4155: Meter waste water $14,438 $500 - - - $14,438
-
Tgal
- - -
04 3.5311: Recover and reuse waste material $5,700 - - - - - - $5,700
-
lb
-
05 2.2136: Install / repair insulation on steam lines $6,322 $940 - - $6,322
-
MMBtu
- - - -
06 2.4133: Use most efficient type of electric motors $2,846 $5,628 $2,003
95,400
kWh
$843
-
kW-mo/yr
- - - - -
07 2.7124: Make a practice of turning off lights when not needed $1,873 $2,400 $828
39,439
kWh
$1,045
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $940 $2,256 $417
19,840
kWh
$523
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $175,648 $17,986 $3,248
154,679
kWh
$130,547
-
kW-mo/yr
$6,322
-
MMBtu
$14,438
-
Tgal
$18,573
-
gal
$5,700
-
lb
$(-3,180.0)
TOTAL IMPLEMENTED $169,008 $15,730 $2,831
134,839
kWh
$130,024
-
kW-mo/yr
$6,322
-
MMBtu
$14,438
-
Tgal
$18,573
-
gal
- $(-3,180.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs